Shield tunneling method - Company Ranking(7 companyies in total)
Last Updated: Aggregation Period:Jul 16, 2025〜Aug 12, 2025
This ranking is based on the number of page views on our site.
Display Company Information
Company Name | Featured Products | ||
---|---|---|---|
Product Image, Product Name, Price Range | overview | Application/Performance example | |
【Construction Achievements】 ■Project Name: Futaba Area Pepenai Waterway No. 1 Tunnel Construction ・Client: Hokkaido Development Bureau ・Shield Outer Diameter: Φ2680mm ・Construction Length: 750m ■Project Name: Auxiliary Public Sewer Construction Project Pipeline Construction ・Client: Gunma Prefecture ・Shield Outer Diameter: Φ2140mm ・Construction Length: 1158m, etc. *For more details, please download the PDF or contact us. | For more details, please download the PDF or contact us. | ||
【Construction Achievements】 ■Project Name: Urban Planning Project Yodogawa Right Bank Basin Sewerage Takatsuki Shimamoto Rainwater Main Line (Section 4) Sewer Pipe Construction Work ■Client: Osaka Prefecture Northern Basin Sewerage Office ■Finished Inner Diameter: Φ4000mm, Φ3000mm ■Required Days for Separation Start: 9 Days *For more details, please download the PDF or contact us. | For more details, please download the PDF or contact us. | ||
【Construction Achievements】 ■Project Name: New Installation of Tanimachi-suji Pipeline and New Installation of Kaminihonmachi Line Pipeline ■Client: Kansai Electric Power ■Construction Details ・Main tunnel outer diameter Φ7.1m, branch tunnel outer diameter Φ4.1m ・At approximately 1.1km point of the main tunnel (pipeline length 2.7km), branching occurs 50m beneath the subway station building ■This construction project received the Technical Award from the Japan Society of Civil Engineers in the fiscal year 1998 *For more details, please download the PDF or contact us. | For more details, please download the PDF or contact us. | ||
---
--- |
--- |
-
- Featured Products
-
Composite shield construction method
- overview
- 【Construction Achievements】 ■Project Name: Futaba Area Pepenai Waterway No. 1 Tunnel Construction ・Client: Hokkaido Development Bureau ・Shield Outer Diameter: Φ2680mm ・Construction Length: 750m ■Project Name: Auxiliary Public Sewer Construction Project Pipeline Construction ・Client: Gunma Prefecture ・Shield Outer Diameter: Φ2140mm ・Construction Length: 1158m, etc. *For more details, please download the PDF or contact us.
- Application/Performance example
- For more details, please download the PDF or contact us.
Soil pressure type parent-child shield method
- overview
- 【Construction Achievements】 ■Project Name: Urban Planning Project Yodogawa Right Bank Basin Sewerage Takatsuki Shimamoto Rainwater Main Line (Section 4) Sewer Pipe Construction Work ■Client: Osaka Prefecture Northern Basin Sewerage Office ■Finished Inner Diameter: Φ4000mm, Φ3000mm ■Required Days for Separation Start: 9 Days *For more details, please download the PDF or contact us.
- Application/Performance example
- For more details, please download the PDF or contact us.
Branch Shield Method (Underground Stem Method)
- overview
- 【Construction Achievements】 ■Project Name: New Installation of Tanimachi-suji Pipeline and New Installation of Kaminihonmachi Line Pipeline ■Client: Kansai Electric Power ■Construction Details ・Main tunnel outer diameter Φ7.1m, branch tunnel outer diameter Φ4.1m ・At approximately 1.1km point of the main tunnel (pipeline length 2.7km), branching occurs 50m beneath the subway station building ■This construction project received the Technical Award from the Japan Society of Civil Engineers in the fiscal year 1998 *For more details, please download the PDF or contact us.
- Application/Performance example
- For more details, please download the PDF or contact us.
-
Membership (free) is required to view all content.